Roof work
Solar panel removal and refitting in Torquay and Devon
Bolido Solar removes solar panels before roof work and refits them afterwards, across Torquay, Torbay and Devon. Every panel is checked while it is down, and we plan the dates around your roofer.
- ½ day
- To remove up to 16 panels, whatever the roof
- ≤2 days
- To refit. Slate roofs take longer
- 5+ years
- Arrays this age get new connectors when we refit
How it works
- 1
Agree the dates
We work out the timing with you and talk to your roofer directly.
- 2
Remove and check
Panels come down safely and each one is checked for condition, function and safety.
- 3
Roof work
Your roofer gets a clear roof to work on.
- 4
Refit
Panels go back on, fixed down to the rafters. On slate, angles are cut for each anchor point.
- 5
Test and recommission
The system is tested and switched back on before we leave.

Older arrays
Why we fit new connectors when we refit
On older arrays there is a high chance of insulation resistance errors caused by water getting into the old connectors.
The panels are already off the roof, so it is the right time to deal with it rather than a separate callout later.
Plan ahead
What takes longer
Micro-inverter systems, arrays spread across several roof faces and slate roofs all add time.
We tell you up front, so your roofer can plan around it.
Removal questions
Do I need to take my solar panels off to replace my roof?
Yes, if the work is on the part of the roof under the panels. Work on other roof faces can often go ahead with the panels left in place. Send us a photo and we will tell you which applies.
Can my roofer take the panels off instead?
We would advise against it. The system has to be shut down and disconnected safely, and refitting means reconnecting and testing the DC side, which is a job for a solar engineer.
Get a free solar quote
Tell us about your property in two minutes. Scott will call you back to arrange a visit, and there's no charge for the survey or the quote.
or call 0330 345 3400


